Originally Posted by
DLax85
How could we have missed this and not gotten similar per day ratio increases in the vacation and sick banks?
Needs to be an item for the next contract.
Because the company wants to "optimize" our vacation but knows a frontal assault would be futile. So, their plan of attack is to slowly take a little here and there eventually reduce our vacation system down to their desired level. Kind of like how a deviatin bank is now based on "accepted fares" that they can't get when it comes time to actually buy the ticket