Originally Posted by
viper548
Reserves 12-13 depending on if it's a 30 or 31 day contractual month. For line holders it's pretty much a minimum of 13. 17 Days on at min guarantee is 89.25. The line construction window could possibly get that high, allowing 17 days on. In a 30 day month, that would be 13 off. I'd say 98% of the time 14 off is the minimum for line holders.
For line holders, it's 10 guaranteed days off, regardless of month length.