Do you all think Compass will be able to hold it together with 20 airplanes and moving the hq? It's a pretty big cost to move hq down to stl and it will be even harder to justify the cost when the overhead is basically the same for a fleet 1/3 the size of what it is now.
Honestly I think compass will let the aa flying go if they don't get any ual flying. Either that or combine the 3 carriers. Nothing else makes sense to me.
Last edited by Maingear; 08-06-2019 at 09:15 AM.