View Single Post
Old 10-06-2019 | 10:03 PM
  #62  
Rodger Wilco
Line Holder
 
Joined: Apr 2013
Posts: 44
Likes: 0
Default

Originally Posted by unlarge
Correction every base but MCO and DFW.
Looks like both MCO and DFW will go to July new hires. So about 4 months to hold them. Or 1.5 months since end of IOE.
Everything else even more junior.
How long from new hire to holding a commutable line in DFW?
How long to upgrade in DFW?
Thanks
Reply