Thread: ExpressJet 2.0
View Single Post
Old 11-07-2019, 09:36 AM
  #1341  
SureJetz
Banned
 
Joined APC: Aug 2019
Posts: 273
Default

Originally Posted by watch View Post
Training time has dropped back to a quick 90 days or so from hire date to being on reserve. Glad to see the ERJ pipeline chugging along at full speed for new hires.

Not a lot of Houston awards for new hires, but the few I've spoken to who got EWR and wanted IAH were able to trade it while still in training.

Have they installed the third ERJ sim at the training center yet?
Anyone who wants IAH won't have any problem after 19-06. Going from 140 CA to 190 CA and 120 FO to 130 FO's. Many of the F/O's will move to the left seating leaving many openings for new hires.

19-06 seems to be all about IAH.
SureJetz is offline