Originally Posted by
WIPilot
what loa is that?
They have to give 10 days notice of a class, so the FEB 4 200 upgrade vacancy can still be a few weeks away. The company is most likely waiting for the flowthrough LOA to be signed. If awarded a class before the LOA is signed, you are not seat locked.