Originally Posted by
vinny7
my concern is no one in my unit has moved on without the flow. However, we do fly the c17 now so maybe that will change going out of the flow. So if yall are saying maybe 3 years max wouldnt it be better to be able to be based in clt sooner?
PSA has a huge operating in CLT. Piedmont's is much smaller. PSA will have many more options. On a bid today, the junior CLT award was #198X out of 204X. No particular lag to hold CLT