Actually spoke to the union/PBS guys yesterday and got some good gouge. He said they were getting lots of calls about RLLs because of categories with no trips in them. If you have no trips and are above the RLL seniority limit, you will basically get a line with zero hour projection. If you do nothing, Schedules assumes you will try to white slip to increase your projection so the key is that you MUST call skeds after lines are published in Icrew but before the 24th and tell them you want the lower guarantee of the window (LCW). You will then get assigned recovery days that are determined by a formula (approx 14-15) These have a 24 hr callout window and no short calls. You can remove some of the recovery days by white slipping