Originally Posted by
AK22
I’m an advocate of incentive lines, and I will bid the longest duration possible. But, these numbers don’t make sense. How does a 20% reduction in block hours next summer equal 750-1000?
They were predicting a really dismal fall and winter though, so if a bunch took the 6 to 9 month options they would still be in better shape this fall and still staffed for next summer.