Finally....the Overage....and BKO
Overage is calculated using ACH, SCH, OSC
if your trip returns to base AFTER the scheduled return time, then OVERAGE is based on the greater of:
1. ACH minus OSC
OR....
2. New/Actual Trip Rig
The greater of those two is OVERAGE pay
(This will be paid in addition to trip guarantee)
+++++++++++++++++++++++++++++++++++++++++
Finally - BKO (Block Override)
BKO = OSC minus SCH
(This will be paid in addition to trip guarantee)
*** and THIS (BKO) is where you'll see the block over 8 (but not the block over 10) if it wasn't figured in to the original Trip Guarantee (SCH)***
Last edited by AFW_MD11; 02-13-2008 at 11:45 AM.
Reason: comment on BKO added