Thread: SkyWest ?’s
View Single Post
Old 05-31-2021 | 09:07 PM
  #1949  
FLPilot3190
Line Holder
 
Joined: Jul 2017
Posts: 86
Likes: 0
From: A320 FO
Default

Originally Posted by CompltResetJet
Not sure if this has been asked before in this thread, but I'm trying to figure the logistics of relocating to my eventual assigned base. I was curious what the typical length of time between completing training at SLC/DEN and starting IOE at your assigned base is.
As little as 3 days up to a couple weeks. My IOE’s for both the CRJ and ERJ were about 4-7 days after the checkride.
Reply