Originally Posted by
connollc
A two day trip I was assigned on LC was supposed to block in before 2359 (original release was 2152) on my last on call day, but extended into an off day and released at 0250. This was due to a wx divert. Gonna make the call to skeds to inquire but am I due any add’l pay above guarantee, or PB day for flying into the off day? Would be good to be armed with some info before I call them as sometimes the skeds dont always give the most correct answer at first.
Thanks in advance to all!
Look at the PWA 23.S.12. The example is almost exactly your situation. X days get pushed, PB day only if you don’t have any more on call days in the month. No extra pay that I can see.