Originally Posted by
PilotBases
Exactly why Delta is taking a dozen or more 220s a year and offsetting the longer RJ flying. If the cost is going to be high, bring it in house where there’s no operational redundancy running a “Connection”. Like I said, look at the 220 bid packs, they tell the story better than I can.
So, a 30 year plan to plan to absorb all its regional feed.