The Mesaba Fleet manager for the CRJ200/900 at mesaba came into our 200 class and explained the deal with getting the 200's. There is no guarrentee of getting two per month. But over the period in which we get the aircraft it averages out to two per month. So really one month we could get nothing and the next month we could get 4. Also we have had a backup of aircraft in CWA geting there refit to mesaba specs. Some of them have taken longer than expected. There is no slow down to the aircraft transfers. We are on track to get 15 9E CRJ's. The only backup in the 200 program is having enough 200's to get people on there OE. My two cents.
-Farva