Originally Posted by
stbloc
How long is it to get MSP in the 900?
The most junior 900 FO in MSP was awarded the move Effective June 1, 2008. He was hired in November of 2007. For him, about 6 months.
The most senior of the FO awarded MSP on the June 1 move date was hired in September 2007. For him, about 8 months.
Safe to say somewhere in the 6-9 month range. As hiring slows this fall, that will increase.