View Single Post
Old 10-04-2022 | 06:31 AM
  #684  
FangsF15's Avatar
FangsF15
Moderator
 
Joined: Sep 2011
Posts: 8,336
Likes: 1,343
Default

Originally Posted by RAH RAH REE


Is this correct? Extended into 2 x-days, with the trip ending at 0600 on the second day. They gave one full PB and one PR with me back on reserve at 1900 on the PR day (ocean crossing). Should I only get 1 full PB day?
No way this is right. 13 hours after release, plus 24 hours for each X-day interrupted (So the 1900 part is correct). If the whole thing was over X days (can’t see what 1 or 2 Oct was), it would be 5 days an a PR. In any case, I see 4 X-days interrupted, so a bare minimum of 3 PB and a PR.

As a reroute, you may also be due RR pay, depending on the details. My bet is they calculated the PB/PR before the trip got expended. Call and ask them to update the PB and ask about RR pay.
Reply