Originally Posted by
FL410
Question about the ADG. If I have a 3 day. First day is 7.5 block. Day 2, 6.5 block. Day 3, 2.0. The total for the trip is 16.0 hrs. Do I get the 5:15 for day 3 to bump up the total or since all 3 days combined is 15:45 (each day 5:15 x 3)? I only get the 16.0? Or on day 3, 5:15?
Thanks.
you get the 16, the 5:15 would help if your 2nd day was worth less, it’s meant to make the money pay for a 3 day 15:45 so basically look at the new rig as 15:45 for a 3 day or better as in your can’t credit less than 15:45 for a 3 day 2 day is 10:30 min and 4 day is 21 min (I think check my math)