Originally Posted by
konabear
Thanks for all the replies. I think I have it figured out now.
On to a third GS issue. I was scheduled to start SC from 0600-1200 on Jan 6. At 1430 on the 5th I was awarded a 4-day GS from 6-9 Jan checking in at 0620. Day 1 of the GS is over my SC day, days 2-4 are over X days. How does the first day pay? Does it go toward my reserve guarantee or, because it is a GS, do I get straight pay on top of guarantee? My time card is currently showing toward guarantee, but the trip still says open.
Sched Alert 19-07 covers RES GS with less than 12 hrs to report.