Old 02-09-2023 | 05:00 AM
  #1729  
Jaww's Avatar
Jaww
Rerouted On Weekends
 
Joined: Oct 2015
Posts: 2,937
Likes: 0
From: 717A
Default

Originally Posted by Scoop
If I wanted to drop a transition trip that operates late March into the April bid period would it drop as long as the March days were positive? I believe it doesn't consider April availability since they are not know but am not sure about this. I am talking straight PD here not wanting to use an APD or IVD.

Thanks Scoop
Im 99% sure that’s how it works until the April bid results would be posted.
Reply