Originally Posted by
Scoop
If I wanted to drop a transition trip that operates late March into the April bid period would it drop as long as the March days were positive? I believe it doesn't consider April availability since they are not know but am not sure about this. I am talking straight PD here not wanting to use an APD or IVD.
Thanks Scoop
Im 99% sure that’s how it works until the April bid results would be posted.