Originally Posted by
Nick Bradshaw
You can do a sim or a line check with an LCP to extend your consolidation an additional 30 days, but after that, you dequal, and have to do requal, which is basically training, a 34X, and a 44X.
Which I’ve done and it was a non-event. Sure, might want to study before it, but it was worth it for the nearly three months off.