Originally Posted by
Airfix
Having a brain fart on bidding in PBS for a reserve line. In my category the reserve grouping rules are 3-99-5. The minimum grouping of reserve days is 3 but I'm like 80% vertain that you can bid the end of the month to have 1 or 2 reserve days on the 31st and 30th of the month because PBS assumes the 1st of the next month will be work block. Is that correct?
Cheers,
Airfix
You’re correct, it gives you the benefit of the doubt at the end of the month because a 3 day block is still possible.