Originally Posted by
DenVa
I have a block of reserve days spanning the monthly transition, and want to move x days around in each month. I essentially want to make 2 in Sept attached to 2 in Oct into 0 in Sept and 4 in Oct. Does the system run the months concurrent, or one before the other?
Essentially, can this be accomplished in one PCS run without causing a min block error or will it take two?
thanks
monthly runs are separate. Take a look at 23B1 note and 23B2 note