Originally Posted by
FangsF15
Point of order (1) is not correct. The pre-release "required" Schedule check can contain a rotation NET 18 hours later, SC 18 hours later, or immediate rest. Obviously YS can reduce that time accordingly. SRH page 88.
I was not arguing what it could contain. I take exception to your assertion that you
must acknowledge anything on your schedule during the pre-release schedule check. That is false.
It is only required to check your schedule per PWA 23.S.1.d. Nothing except assignment of rest requires acknowledgement per PWA 23.S.5.f.1.