Originally Posted by
crewdawg
The massive amount of SC is more likely a result of 18 hour callout. I bet we would get fewer SC if we went back to 12 hour callouts, I'm down, let's make it happen. I'm guessing some on here are going to disagree.
Perhaps with massively increased
contractual limits on SC assignments, along with a return to next day coverage as Jughead suggested.
The maximization of SC is a direct result of BS, RG and others working to squeeze every cent of value out of the PWA, particularly section 23. It’s a permanent paradigm shift. They won’t ever voluntarily return to the previous average of 2-3 SCs per month, even with a reduction in LC time.