Originally Posted by
Ragtop Day
There was a blurb in the latest Scheduling Alert regarding the new SC bidding during line awards. Basically said to bid using the YS template starting with the bid window opening on the 4th, but then all SC YS requests would be cleared before regular PCS runs on the 19th. Maybe the system deleted all of them to have a clean slate for the new process?
It’s two different bid periods. On the PCS screen where you select “reserve preferences and slips”, before selecting that change the bid period to the next bid period. That way your SC YS won’t be conflicting with each other. Just like a GS or WS you put the slip in for the appropriate bid period.