Originally Posted by ohaiyo;
Near the end of the month (June), I had
28: PB
29: PB
30: PR (ending at 0730)
1: RES
I did a two-day GS on 28/29 that blocked in at 1600 on the 29th.
If you pick up a 2-day GS over the 28-29, the days off (in this case your pre-existing PB days) need to be moved to your next RES days. By precedent, the PB day formula, however, will require that the PR on the 30th be converted to a full PB day.
Complicating this a little bit is that JUL1 was part of the JUN 2025 bid period, hence why I had to edit this post after originally posting a different answer.
28: GS Day 1/2
29: GS Day 2/2
30: PB (after previously placed PR from prior trip is converted to PB)
1: PB for GS Day 1/2
BANK: PB for GS Day 2/2
BANK: PR ending 0100L (converts to full PB to be placed in bank)