View Single Post
Old 07-22-2025 | 12:53 AM
  #3625  
Ar Pilot
Line Holder
 
Joined: Apr 2010
Posts: 675
Likes: 20
Default

Originally Posted by TALPAtalker
If you pick up a 2-day GS over the 28-29, the days off (in this case your pre-existing PB days) need to be moved to your next RES days. By precedent, the PB day formula, however, will require that the PR on the 30th be converted to a full PB day.

Complicating this a little bit is that JUL1 was part of the JUN 2025 bid period, hence why I had to edit this post after originally posting a different answer.

28: GS Day 1/2
29: GS Day 2/2
30: PB (after previously placed PR from prior trip is converted to PB)
1: PB for GS Day 1/2
BANK: PB for GS Day 2/2
BANK: PR ending 0100L (converts to full PB to be placed in bank)
The bolded above is referenced in the SRH and applicable only when determining how many PB days are banked.

An important question that hasn’t been asked: what time did the rotation report? This is necessary to determine how many X days were interrupted.
Reply