Originally Posted by
p-3bubba
listen to the fly by night podcast. Marty h says the quiet part out loud. Planning is purposefully pinching every penny to keep us in 4a2fu and the operational side of the house has a blank check to fix the problems planning creates. They’d actually save money if planning wasn’t playing this horse$hit game. That’s the company we work for. They’re doing this on purpose. It’s absolutely unethical ridiculous. Run away from this dumpster fire and don’t apply to work here. If i’m getting 4a2fu’ed in 2026 i’ll go to psa. Literally 1 year pay at any legacy is more than i make in 4a2fu in my widebody seat and equipment. That’s pathetic. This place blows.
-bubs