Originally Posted by
icohftb
Still fuzzy on some 30 hr rest nuances. Scheduling placed 6 hrs of rest (ie 07 Oct 1800 - 08 Oct 0000) prior to a day of the PD I guess to make it a 30 hr rest period. Is there supposed to be some kind of notification? And is it supposed to be designated specifically as 30 hrs since the Rest appears as a 6 hr block + 24 hrs off.
Also can they remove that 6 hrs or rest off my schedule if they subsequently decide to use me on a rotation that releases after 1800?
Thanks!
If you choose to self-acknowledge the rest, then that is a legal 30 hour rest period. If you finish a rotation as a reserve pilot in the bid period and see the notification on your post-rotation schedule check, even if the rest is weeks later, I'd say that constitutes notification. If you do that schedule check with the IVR and it doesn't tell you about it then you are not notified. Outside of that, you must get a call from a live scheduler notifying you of the rest period no later than the start of rest (if you answer your phone) or two hours prior to the start of rest if you don't answer your phone.