View Single Post
Old 11-23-2025 | 04:25 PM
  #4389  
FangsF15's Avatar
FangsF15
Moderator
 
Joined: Sep 2011
Posts: 8,354
Likes: 1,375
Default

Originally Posted by TheProfessor
Question to you PB day gurus. Is there a way to use PB day(s) on anything other than the earliest day(s) of a rotation? SRH seems to say no (pg 56, “the system will automatically place that PB Day(s) on the earliest day(s) of the rotation(s)”), but the collective trickery on this forum has me wondering if I’m reading wrong.

Situation - I have 2 PB days to burn and a rotation I want rid of that has an above ADG day 1 and a particularly valuable day 3 with a low value day 2.

Thank you!
Nope, Has to start on the first day of a trip. IF you were to use 2 PB days on a trip, it would be on day 1 and 2.

This is why finding a high time day 1 is so important to maximize the pay for using a PB for pay. The Perfect trip would be a 1-day with 7-8 hours of block and a couple hours of EDP, for 9-10 hours pay for 1 PB day. But those trips go extremely fast on the swap board, so you have to be constantly checking when the schedules start to release.
Reply