Originally Posted by
thunderbird22
yeah i have the same scenario this month. 23m7 on a (golden) x day. Shows on my time card as the value of the trip in ‘sked time’ ‘pay time’ and ‘credit’. Don’t know how to tell if this will be paid above rsv guarantee. All the trips i got assigned on rsv look the same on my time card as the 23m7 does.
Things that are Pay and Credit go TOWARD the guarantee.
Things that are Pay only (no credit) go ABOVE guarantee.
So if the 23M7 line in the top 3rd of your timecard (where your normal rotations, SCC, etc show up) has time showing in the credit column, then it's showing as pay and credit, which isn't correct.