CBA 25.D.2. Secondary Line Construction
25.D.2.f.......will be constructed within the applicable line spread.....
the spread is 13 CH between the highest and lowest BLG regular line
so......does this mean that in ANC in March, FO secondary lines (max of 74:00) will be built between 74:00 and 61:00 (13 CH spread)? and a 61:00 secondary line would meet the CBA construction criteria?
or.....??