View Single Post
Old 02-17-2010, 07:31 AM
  #2  
AFW_MD11
Gets Weekends Off
 
AFW_MD11's Avatar
 
Joined APC: Feb 2007
Position: MD11 FO, ANC
Posts: 1,098
Default

CBA 25.D.2. Secondary Line Construction

25.D.2.f.......will be constructed within the applicable line spread.....

the spread is 13 CH between the highest and lowest BLG regular line

so......does this mean that in ANC in March, FO secondary lines (max of 74:00) will be built between 74:00 and 61:00 (13 CH spread)? and a 61:00 secondary line would meet the CBA construction criteria?

or.....??
AFW_MD11 is offline