FDX March 2010 Sec Line Values
#1
Gets Weekends Off
Thread Starter
Joined APC: Nov 2006
Position: 767 FO
Posts: 8,047
FDX March 2010 Sec Line Values
Must lead turn the eventual 10 posts asking for data.
MEM MD11
CA 71:00
FO 71:00
ANC MD11
CA 68:00
FO 74:00
LAX MD11
CA 68:00
FO 71:30
MEM A300
CA 68:00
FO 73:00
HKG A300
CA 76:54
FO 76:54
MEM B757
CA 76:32
FO 76:32
MEM B727
CA 70:00
FO 67:18
SO 64:00
Us 727 Reg line holders are chumps.
MEM MD11
CA 71:00
FO 71:00
ANC MD11
CA 68:00
FO 74:00
LAX MD11
CA 68:00
FO 71:30
MEM A300
CA 68:00
FO 73:00
HKG A300
CA 76:54
FO 76:54
MEM B757
CA 76:32
FO 76:32
MEM B727
CA 70:00
FO 67:18
SO 64:00
Us 727 Reg line holders are chumps.
#2
CBA 25.D.2. Secondary Line Construction
25.D.2.f.......will be constructed within the applicable line spread.....
the spread is 13 CH between the highest and lowest BLG regular line
so......does this mean that in ANC in March, FO secondary lines (max of 74:00) will be built between 74:00 and 61:00 (13 CH spread)? and a 61:00 secondary line would meet the CBA construction criteria?
or.....??
25.D.2.f.......will be constructed within the applicable line spread.....
the spread is 13 CH between the highest and lowest BLG regular line
so......does this mean that in ANC in March, FO secondary lines (max of 74:00) will be built between 74:00 and 61:00 (13 CH spread)? and a 61:00 secondary line would meet the CBA construction criteria?
or.....??
#3
Gets Weekends Off
Thread Starter
Joined APC: Nov 2006
Position: 767 FO
Posts: 8,047
What it means to me is the low reg line is 61 and therfore they can only build a secondary line up to 74.
They wish they could go higher, allowing them to hide more trips from the bid pack.
They wish they could go higher, allowing them to hide more trips from the bid pack.
#4
That's why I asked.
Looking at the ANC bidpack for March - FO's
High Line = 71:04
Low Line = 63:07
So, I was trying to figure out exactly how they come up with 74:00 max and how the 13CH spread fits into that.
71+/- down to 63+/- would all be within the 74:00 - 61:00 spread - maybe 74:00 was the target max for building regular lines also?
anyway....just curious....I'm still trying to figure out exactly how they're manipulating everything too.
Looking at the ANC bidpack for March - FO's
High Line = 71:04
Low Line = 63:07
So, I was trying to figure out exactly how they come up with 74:00 max and how the 13CH spread fits into that.
71+/- down to 63+/- would all be within the 74:00 - 61:00 spread - maybe 74:00 was the target max for building regular lines also?
anyway....just curious....I'm still trying to figure out exactly how they're manipulating everything too.
#5
interesting also....
looking at MEM MD11 FO
High Line = 73:04
Low Line = 65:00
but the Secondary line max is only 71:00
this doesn't make sense if the Secondary lines are to be built within the same 13CH spread as the regular lines? does it?
seems the Secondary line max should be at least 73:04?? (the high reg line)
looking at MEM MD11 FO
High Line = 73:04
Low Line = 65:00
but the Secondary line max is only 71:00
this doesn't make sense if the Secondary lines are to be built within the same 13CH spread as the regular lines? does it?
seems the Secondary line max should be at least 73:04?? (the high reg line)
#6
Gets Weekends Off
Joined APC: Jul 2009
Posts: 1,224
AFW,
This is another good opportunity to spread out the flying. With a 71 hour max, they can build 58 hour secondary lines. For some reason, we agreed on a high spread, I believe it was lower in the past contract. Why not have a bunch of secondary lines filled at 58? This beats the 4.a.2.b. lines. I think my line last month was 59 hours or so.
This is another good opportunity to spread out the flying. With a 71 hour max, they can build 58 hour secondary lines. For some reason, we agreed on a high spread, I believe it was lower in the past contract. Why not have a bunch of secondary lines filled at 58? This beats the 4.a.2.b. lines. I think my line last month was 59 hours or so.
#7
golf,
yeah....it used to be 11CH spread (until Jan 2008) - new CBA changed it to 13CH.
my question is more one of "where does the secondary line MAX number come from?"
I thought it was supposed to be based on the regular line max, but I guess the company can just pull a secondary max # out of you-know-where and then build the secondary lines down 13CH from there?
in other words....the 13CH spread is contractual - but where is it written what these MAX secondary numbers they come out with every month have to be?
is this another 4A2b - we (management) decide what the max will be? and ALPA can't do anything about it?
all we (management) have to do is comply with the 13CH spread? and not go below the 4A2b 48/60CH?
that must be the answer.
yeah....it used to be 11CH spread (until Jan 2008) - new CBA changed it to 13CH.
my question is more one of "where does the secondary line MAX number come from?"
I thought it was supposed to be based on the regular line max, but I guess the company can just pull a secondary max # out of you-know-where and then build the secondary lines down 13CH from there?
in other words....the 13CH spread is contractual - but where is it written what these MAX secondary numbers they come out with every month have to be?
is this another 4A2b - we (management) decide what the max will be? and ALPA can't do anything about it?
all we (management) have to do is comply with the 13CH spread? and not go below the 4A2b 48/60CH?
that must be the answer.
#8
Gets Weekends Off
Joined APC: Nov 2006
Posts: 426
Past 4.a.2.b. practice has not had a VTO line lower than the lowest Line in the bid pack.
I think this question will answer most being asked. Look at MD-11 MEM for the last few months....lowest Secondary Line was not lower than a normal line, effectually making the spread moot.
I could be wrong....
I think this question will answer most being asked. Look at MD-11 MEM for the last few months....lowest Secondary Line was not lower than a normal line, effectually making the spread moot.
I could be wrong....
#10
Gets Weekends Off
Joined APC: Nov 2006
Posts: 426
The contract reads (paraphrasing) "Secondary Lines to be constructed within the 13 BLG Spread of Normal Lines"
Look at the bid pack -- lines from 65 to 73 THEREFORE VTO Lines will all be built within that spread (not higher, not lower). The company is targeting 71 hours.
Look at the bid pack -- lines from 65 to 73 THEREFORE VTO Lines will all be built within that spread (not higher, not lower). The company is targeting 71 hours.
Thread
Thread Starter
Forum
Replies
Last Post