Originally Posted by
teamdothis
right, thats what im saying. with indoc, crm, EP's, systems could not have been much longer than it is now for the rehire class. Hey Evil what is the rest of the footprint looking like?
Right now it's like this;
Day 1.........HR
Days 2-3....Basic Indoc recap (includes life vest demo/sign-off).
Days 4-6....Systems
Day 7........Systems test then QRH, RTOs, Release, Winter Ops, etc.
Day 8........W&B, TLR (1st part), Checklist presentation (??), CRM
Day 9........TLR (2nd part), PPAS
Day 10......Flap AD, Physiology, Airplane Drills, some other things too.
Sims....3 scheduled, then MV, then LOFT, then LOE.
Got a very sweet sim schedule this time around.
Of course, weekends off and
most likely 3 days off in between Ground and Sims.