Originally Posted by
The Chow
What I would have loved to have seen in this announcement was that as the 50 seat aircraft were being returned and Delta pilots were taking those routes back.
Maybe those guys can still recapture some of that flying.
If mgmt says CMR is 20% overcost operating CRJ50's w/ 14 people what is the cost to operate a DC-9 or MD-80 w/ 14 pax over the same rte? It won't be going to DAL.....