Your numbers are right in line with what I expect on the next contract. Someone did a fairly detailed calculation on restoration on the other forum. His number needed for a full restoration was about a 65 percent raise. In addition going back to all the old work rules ect.. would require another 3000 pilots on the list. We went from a 600 average block hour per pilot to 800 hours with the 1113 contract.