While everything has a cost, the checkbook will be opened up to a very significant degree. Period. As in somewhere in the 9 to 10 figures annually range. The fact that everything we want in C12K having a cost and the new contract having to be cost neutral because of that are two different things. The first is a fact, while the second is from a worn out copy of a bad airline manager's playbook.