Search

Notices

737 MAX Thread Drift

Thread Tools
 
Search this Thread
 
Old 01-12-2026 | 10:40 AM
  #1  
Avgeek7248's Avatar
Thread Starter
What's a weekend?
On Reserve
 
Joined: Dec 2017
Posts: 708
Likes: 75
From: Widget FO
Default 737 MAX Thread Drift

Originally Posted by icohftb
Supporting 320 deliveries? Last year we hardly had any 320s in the new hire classes / half the class was getting 220s.
as of now those are really the only major growing fleets with consistent deliveries. Curious how much hiring will come with the MAX10 certification. Let alone all the training required for the MAX qual to get everyone checked out. Surprised we haven’t gotten a head start on it. Worries me we either don’t believe it’s very close or that we’re gonna be behind the curve when it finally does. My guess is the former.
Reply
Old 01-12-2026 | 01:35 PM
  #2  
Line Holder
 
Joined: Jan 2018
Posts: 496
Likes: 81
Default

Originally Posted by Avgeek7248
as of now those are really the only major growing fleets with consistent deliveries. Curious how much hiring will come with the MAX10 certification. Let alone all the training required for the MAX qual to get everyone checked out. Surprised we haven’t gotten a head start on it. Worries me we either don’t believe it’s very close or that we’re gonna be behind the curve when it finally does. My guess is the former.
With every new CQ cycle, we are one CQ cycle away from adding a day of MAX training! At least that is what I have been told every time I go to CQ.
Reply
Old 01-12-2026 | 06:00 PM
  #3  
Gets Weekends Off
 
Joined: Sep 2015
Posts: 5,516
Likes: 186
From: UNA
Default

Originally Posted by iLikeMoose
With every new CQ cycle, we are one CQ cycle away from adding a day of MAX training! At least that is what I have been told every time I go to CQ.
anyone know if this next cycle will start it? If it’s not on this CQ I’d wager 1 of 2 things

1) they have no plans to operate the Max at anytime before q3 2027 (most likley)

or possibly
2) they will only qual 1 base at a time and push max flying to specific bases

Reply
Old 01-13-2026 | 07:28 PM
  #4  
On Reserve
 
Joined: Dec 2009
Posts: 20
Likes: 0
Default

Originally Posted by Gone Flying
anyone know if this next cycle will start it? If it’s not on this CQ I’d wager 1 of 2 things

1) they have no plans to operate the Max at anytime before q3 2027 (most likley)

or possibly
2) they will only qual 1 base at a time and push max flying to specific bases
Expect that initially the Max10 will either be project pilot flown for the first 3-6 months, or that they will do a base by base qual. Think ATL first then the other bases.
Reply
Old 01-14-2026 | 07:38 AM
  #5  
Gets Weekends Off
 
Joined: Jan 2023
Posts: 3,365
Likes: 800
Default

Originally Posted by Gone Flying
anyone know if this next cycle will start it? If it’s not on this CQ I’d wager 1 of 2 things

1) they have no plans to operate the Max at anytime before q3 2027 (most likley)

or possibly
2) they will only qual 1 base at a time and push max flying to specific bases
1 - no. It's not really a new type to our stable like the 220 or 350. It's a 737. We've been operating them for decades and plus that's not the plan I've seen

2. You're getting warmer
Reply
Old 01-14-2026 | 01:55 PM
  #6  
Gets Weekends Off
Liked
25M+ Airline Miles
Line Holder
Gets Weekends Off
 
Joined: Jul 2010
Posts: 12,823
Likes: 160
From: window seat
Default

Originally Posted by alohacessna
Expect that initially the Max10 will either be project pilot flown for the first 3-6 months, or that they will do a base by base qual. Think ATL first then the other bases.
I don’t think there is any way to “project pilot fly” a fleet for 6 months. It will probably be 1-2 bases initially and there is precedent for that. When DL got the MD-90 I think CVG was the first base. Then it quickly expanded to all the 88 bases. Given that the 321NEO was mostly train by memo, I doubt the MAX spool up will be logistically challenging at all. While not the exact same situation, there’s already 2 sims for it ready to go on day one. From the day the first one enters revenue service I doubt it’ll be a year before all bases are fully qualled to fly it. Most likely 6 months or so max. Not a big deal.
Reply
Old 01-16-2026 | 02:50 PM
  #7  
Avgeek7248's Avatar
Thread Starter
What's a weekend?
On Reserve
 
Joined: Dec 2017
Posts: 708
Likes: 75
From: Widget FO
Default

Originally Posted by Hotel Kilo
1 - no. It's not really a new type to our stable like the 220 or 350. It's a 737. We've been operating them for decades and plus that's not the plan I've seen

2. You're getting warmer
You still have to do the required MAX training which requires a sim session now. The MAX is actually quite different from the NG both how it flies and the functionality of the switches and buttons being slightly altered. Also the 10 coming with a touch screen FMC on the FO side.
Reply
Old 01-16-2026 | 03:40 PM
  #8  
Gets Weekends Off
 
Joined: Sep 2015
Posts: 5,516
Likes: 186
From: UNA
Default

Originally Posted by Avgeek7248
You still have to do the required MAX training which requires a sim session now. The MAX is actually quite different from the NG both how it flies and the functionality of the switches and buttons being slightly altered. Also the 10 coming with a touch screen FMC on the FO side.
just the FO side?

also who thought a touchscreen was a good idea?
Reply
Old 01-16-2026 | 03:49 PM
  #9  
Gets Weekends Off
 
Joined: Jan 2023
Posts: 3,365
Likes: 800
Default

Originally Posted by Avgeek7248
You still have to do the required MAX training which requires a sim session now. The MAX is actually quite different from the NG both how it flies and the functionality of the switches and buttons being slightly altered. Also the 10 coming with a touch screen FMC on the FO side.
Most of this is not true especially the flying part.

Yes it has touch screen. Some switches are slightly different. Yes you get a sim. Mostly gonna cover MCAS and a few other things about LEAP.

It's not going to require 6 months of project pilot flying like for the 220 for example as some have stayed on here. UAL, AAL, SWA Alaska seemlessly flip from one model to the next in regular operations. The MAX ain't all that different despite what you think.

Reply
Old 01-16-2026 | 04:07 PM
  #10  
Avgeek7248's Avatar
Thread Starter
What's a weekend?
On Reserve
 
Joined: Dec 2017
Posts: 708
Likes: 75
From: Widget FO
Default

Originally Posted by Hotel Kilo
Most of this is not true especially the flying part.

Yes it has touch screen. Some switches are slightly different. Yes you get a sim. Mostly gonna cover MCAS and a few other things about LEAP.

It's not going to require 6 months of project pilot flying like for the 220 for example as some have stayed on here. UAL, AAL, SWA Alaska seemlessly flip from one model to the next in regular operations. The MAX ain't all that different despite what you think.
Yes, it is. Sincerely someone who flew and taught the MAX at a previous airline. Line pilots will
be able to switch no problem. But it’s definitely a much different machine NG to MAX then it is CEO to NEO. The first thing you notice is how much smoother and responsive it is compared to the NG. Think 75 vs 76. HUD is in the FMC instead of the dedicated HGS box. Some of the functions like AIII are different. It’s noticeably slicker coming down. Big screens but the actual PFD is somehow smaller. Let alone the 10 being a massive Frankenstein compared to the already lipsticked pig that is the 9ER.
Reply
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
sailingfun
Delta
511
07-25-2022 08:54 AM
docav8tor
Southwest
7
12-23-2020 09:17 AM
Winston
Southwest
17
11-12-2019 04:05 PM
docav8tor
Safety
0
08-21-2019 02:20 AM
sMFer
Southwest
49
06-30-2019 03:13 AM

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



Your Privacy Choices