![]() |
717 growth ramp rate
Anyone know the ROT for how many aircrew per A/C are required? With Delta taking on 88 717s, it seems that would require a good number of folks. Watching the 717 drops so far showing 2 to 4, sometimes 6. Is that something we'd expect to see increase a little in the coming months? Grateful for some insight, thanks.
|
Originally Posted by Walli62
(Post 1622970)
Anyone know the ROT for how many aircrew per A/C are required? With Delta taking on 88 717s, it seems that would require a good number of folks. Watching the 717 drops so far showing 2 to 4, sometimes 6. Is that something we'd expect to see increase a little in the coming months? Grateful for some insight, thanks.
|
Originally Posted by Walli62
(Post 1622970)
Anyone know the ROT for how many aircrew per A/C are required? With Delta taking on 88 717s, it seems that would require a good number of folks. Watching the 717 drops so far showing 2 to 4, sometimes 6. Is that something we'd expect to see increase a little in the coming months? Grateful for some insight, thanks.
|
Originally Posted by LeineLodge
(Post 1623027)
You're absolutely right. Expect the number of 717 slots to increase going forward as they catch up with the training backlog.
Don't think it's a training backlog I think the are just waiting for AE for CA on the 717. Going through training now and most instructors don't like fo/fo training. |
Originally Posted by bohicagain
(Post 1623032)
I have yet to see E period sims
Don't think it's a training backlog I think the are just waiting for AE for CA on the 717. Going through training now and most instructors don't like fo/fo training. Guys that finished the sim in late JAN/early FEB are just now going to OE. I think some of the furlough recalls and new hires have gone through a little faster as they benefit from the quicker consolidation of knowledge - not that everyone's proficiency doesn't suffer after a few months on the bench. |
Originally Posted by bohicagain
(Post 1623032)
I have yet to see E period sims
Don't think it's a training backlog I think the are just waiting for AE for CA on the 717. Going through training now and most instructors don't like fo/fo training. |
Apr 14th Aircraft Drop:
3 x 88 - ATL 9 x 717 - ATL 8 x ER - DTW 2 x 737 - NYC 2 X 320 - NYC |
Originally Posted by bohicagain
(Post 1623032)
I have yet to see E period sims
Don't think it's a training backlog I think the are just waiting for AE for CA on the 717. Going through training now and most instructors don't like fo/fo training. |
Originally Posted by C17flyguy
(Post 1622976)
Also does anybody know if the 717 is headed to NYC ever?
|
Originally Posted by sailingfun
(Post 1623098)
Crew planning has stated the next 717 base will be NYC. Rumored bids will be put out in the fall.
|
| All times are GMT -8. The time now is 10:30 AM. |
Website Copyright © 2026 MH Sub I, LLC dba Internet Brands