Airline Pilot Central Forums

Airline Pilot Central Forums (https://www.airlinepilotforums.com/)
-   Endeavor Air (https://www.airlinepilotforums.com/endeavor-air/)
-   -   EDV Hiring (https://www.airlinepilotforums.com/endeavor-air/112941-edv-hiring.html)

flywithjohn 06-22-2018 05:34 PM


Originally Posted by AFSOCFlyr (Post 2619187)
Confirm that an in-person interview in MSP is required prior to a CJO? ie no phone-only or job fair interviews? I know that they fly you up, etc..I'm just short on days off. Thanks!

Yes in person, not necessarily in MSP though.

DragonFlyer14 07-05-2018 09:43 AM

class dates
 
Any word on when the next available class dates are? Are they still hiring for late 2018 or are confirmed class dates only being given out for 2019?

flywithjohn 07-05-2018 09:47 AM


Originally Posted by DragonFlyer14 (Post 2628265)
Any word on when the next available class dates are? Are they still hiring for late 2018 or are confirmed class dates only being given out for 2019?

They are back to regular capacity at around 50-60 a month spread out over two classes.

KSCessnaDriver 07-05-2018 10:07 AM


Originally Posted by flywithjohn (Post 2628268)
They are back to regular capacity at around 50-60 a month spread out over two classes.

I thought that I had heard it was 4 smaller classes a month now. Or that it was in the works to do that, to smooth the scheduling issues

blindfayth 07-05-2018 10:16 AM

Earliest class dates are currently August.

flywithjohn 07-05-2018 02:12 PM


Originally Posted by KSCessnaDriver (Post 2628278)
I thought that I had heard it was 4 smaller classes a month now. Or that it was in the works to do that, to smooth the scheduling issues

That was the case, I'm not sure why or what happened to change it in first place let alone why it returned to high volume. Right now there is minimal delays unless your 200. But that is being caused by an OE problem. Last I heard there is around 50 people waiting for OE at 5-7 weeks after LOE.

aviatorpr 07-05-2018 04:25 PM


Originally Posted by flywithjohn (Post 2628466)
Right now there is minimal delays unless your 200. But that is being caused by an OE problem. Last I heard there is around 50 people waiting for OE at 5-7 weeks after LOE.

Just started OE after 50 days off between the LOE on the 200. :eek:

JulesWinfield 07-05-2018 04:36 PM

900 training is fast. I was done with OE in under 3 months.

PotatoChip 07-05-2018 04:45 PM


Originally Posted by aviatorpr (Post 2628558)
Just started OE after 50 days off between the LOE on the 200. :eek:

43 days for me.

flywithjohn 07-05-2018 05:41 PM

200 delays
 

Originally Posted by aviatorpr (Post 2628558)
Just started OE after 50 days off between the LOE on the 200. :eek:

Sounds about right - 200 delays are the result of the perfect storm of a
smaller fleet with less OE captains, less routes and they are shorter so OE takes longer. There is people who were hired in January still waiting to touch a plane.


All times are GMT -8. The time now is 10:21 AM.


User Alert System provided by Advanced User Tagging v3.3.0 (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
Website Copyright ©2000 - 2017 MH Sub I, LLC dba Internet Brands