Go Back   Airline Pilot Central Forums - Find your next job as a Pilot > > >
Endeavor Air Regional Airline
 

Welcome to Airline Pilot Forums - Connect and get the inside scoop on Airline Companies

If this is your first visit, be sure to check out the FAQ. Join our community today and start interacting with existing members. Registration is fast, simple and absolutely free.


User Tag List

Reply
 
Thread Tools Search this Thread Display Modes
Old 04-14-2018, 02:49 PM   #1  
New Hire
Thread Starter
 
Joined APC: Mar 2018
Posts: 7
Default EDV Hiring

Interviewed in early March. Given a CJO but no training date. I got a call two days ago from HR saying still no specific date but itís looking like late 2018, early 2019. Also, they have stopped hiring for the time being.
Eire78 is offline   Reply With Quote
Old 04-14-2018, 03:05 PM   #2  
Gets Weekends Off
 
Joined APC: May 2017
Posts: 583
Default

Quote:
Originally Posted by Eire78 View Post
Interviewed in early March. Given a CJO but no training date. I got a call two days ago from HR saying still no specific date but itís looking like late 2018, early 2019. Also, they have stopped hiring for the time being.
Yes that is correct. No more classes till the end of summer for new hires. Interviews will start back up then as well.

Sent from my SM-G965U using Tapatalk
Casualinterest is offline   Reply With Quote
Old 04-14-2018, 04:04 PM   #3  
Short bus CA (CR2)
 
aviationfrk's Avatar
 
Joined APC: Apr 2007
Posts: 139
Default

Quote:
Originally Posted by Eire78 View Post
Interviewed in early March. Given a CJO but no training date. I got a call two days ago from HR saying still no specific date but it’s looking like late 2018, early 2019. Also, they have stopped hiring for the time being.
I'm going through upgrade simulators right now for the 200. My sim partner is a December 2017 new hire. (Has his LOE scheduled this coming week) Most of the other new hires I talk to in the sim center are in similar situations. Sounds like we just need a little time to get caught up.
aviationfrk is offline   Reply With Quote
Old 04-14-2018, 04:08 PM   #4  
New Hire
 
Joined APC: Nov 2017
Posts: 7
Default

I'm in the same boat. Interviewed Feb. Waiting on a class date. Hiring has been very helpful in keeping me in the loop. Hoping date is sooner than 2019, but I'm going to wait it out and keep fingers crossed for a phone call.
dfb008 is offline   Reply With Quote
Old 04-15-2018, 04:40 AM   #5  
Gets Weekends Off
 
Joined APC: Apr 2006
Position: Kenworth T680 Captain
Posts: 387
Default

When is the last scheduled new hire ground then? This is contrary to what we were just told a couple weeks ago in the C building. They said they were doing small classes of 15 until late summer to get caught up on the backup. I know there was a class after us that was January interviewees. Wierd, makes me nervous. I hope it is actually just to catch up on the training backlog and not something more, cause the 900 class had no delay. There were guys that only got one day off between ground and procedure trainers. So that doesn't really add up.
UNDGUY is offline   Reply With Quote
Old 04-15-2018, 05:46 AM   #6  
New Hire
Thread Starter
 
Joined APC: Mar 2018
Posts: 7
Default

Just before my interview in March, the info I was given was that training classes were backed up into June. Ok, thatís fine. Then a call saying EOY or 2019 and even that was an estimate. Itís forced me to look elsewhere.
Eire78 is offline   Reply With Quote
Old 04-15-2018, 06:27 AM   #7  
Gets Weekends Off
 
Joined APC: May 2017
Posts: 583
Default

Quote:
Originally Posted by UNDGUY View Post
When is the last scheduled new hire ground then? This is contrary to what we were just told a couple weeks ago in the C building. They said they were doing small classes of 15 until late summer to get caught up on the backup. I know there was a class after us that was January interviewees. Wierd, makes me nervous. I hope it is actually just to catch up on the training backlog and not something more, cause the 900 class had no delay. There were guys that only got one day off between ground and procedure trainers. So that doesn't really add up.
I misspoke (was tired) there are new hire classes still going on the rest of the year, they're just smaller. No one without a class date is getting one until the end of summer

Sent from my SM-G965U using Tapatalk
Casualinterest is offline   Reply With Quote
Old 04-15-2018, 06:27 AM   #8  
Line Holder
 
Joined APC: Jan 2018
Posts: 70
Default

I interviewed in January and was offered a class date in late March, but couldnít take it due to another commitment. So I was scheduled in May. The previous commitment fell through, so I called to see about an earlier date. I was told that theyíd push dates back, but not forward. Consequently, I started looking elsewhere and found several 121 gigs that started pretty much right away. Decided to wait for 9E, but then the part 91/135 contract offers started coming in. Itís going to be tough to leave that part of the private stuff behind. It seems that everyone except Endeavor is hurting for pilots.
Mustang62 is offline   Reply With Quote
Old 04-15-2018, 06:43 AM   #9  
Gets Weekends Off
 
Joined APC: Apr 2006
Position: Kenworth T680 Captain
Posts: 387
Default

[QUOTE=Casualinterest;2572608]I misspoke (was tired) there are new hire classes still going on the rest of the year, they're just smaller. No one without a class date is getting one until the end of summer

Oh ok. Thank you for clarifying. Yea, that is right in line with what they told us. If you were a February interviewee, I would say you should be the first one called after they start back up. I think most January interviewees have class dates and some have already finished ground school. I waited three months only because I already had a good job, I was taking a paycut to come to Endeavor, and they gave me a class date at the interview. With the uncertainty and length of time you guys are talking about, I think I would be looking elsewhere.
UNDGUY is offline   Reply With Quote
Old 04-15-2018, 11:09 AM   #10  
Gets Weekends Off
 
Joined APC: Sep 2016
Posts: 438
Default

Quote:
Originally Posted by Mustang62 View Post
I interviewed in January and was offered a class date in late March, but couldnít take it due to another commitment. So I was scheduled in May. The previous commitment fell through, so I called to see about an earlier date. I was told that theyíd push dates back, but not forward. Consequently, I started looking elsewhere and found several 121 gigs that started pretty much right away. Decided to wait for 9E, but then the part 91/135 contract offers started coming in. Itís going to be tough to leave that part of the private stuff behind. It seems that everyone except Endeavor is hurting for pilots.
There's a reason for that.
DarkSideMoon is online now   Reply With Quote
 
 
 

 
Reply
 



Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Related Topics
Thread Thread Starter Forum Replies Last Post
Mainline airline pilot hiring to increase av8tordude Major 39 09-02-2012 07:16 PM
Shortage or Just Hiring Wave- Analysis PilotAnalyst Major 64 06-09-2012 12:29 PM
Phoenix Job Fair-Pilot Hiring Update for 2012 AeroCrewSolut Hiring News 2 01-26-2012 09:49 PM
American Eagle Hiring Mins Lowered to 500 hrs edavis Hiring News 22 06-29-2011 04:38 PM
What airlines are hiring? stbloc Hiring News 13 03-09-2011 03:56 PM


All times are GMT -8. The time now is 10:36 AM.


vBulletin® v3.9.3.5, Copyright ©2000-2018, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.1
User Alert System provided by Advanced User Tagging v3.3.0 (Lite) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.
Copyright ©2000 - 2017 MH Sub I, LLC dba Internet Brands