Airline Pilot Central Forums

Airline Pilot Central Forums (https://www.airlinepilotforums.com/)
-   Regional (https://www.airlinepilotforums.com/regional/)
-   -   Sept. 22nd Mesaba Class (https://www.airlinepilotforums.com/regional/30903-sept-22nd-mesaba-class.html)

bored 09-12-2008 09:24 AM

All ground schools start in Eagan, MN at the XJ training center, this includes indoc and systems. For sim, at the training center there are 2 saab sims and a CRJ200 sim with our 900 sim coming online shortly. That said... there is still a chance one could go to Montreal or Denver for sim as apparently those contracts that were due to end have been extended. Normal training footprint is about 6-8 weeks. During our massive ramp up, people were waiting a long time for OE once sim was complete, especially on the 200. With the entire 200 fleet on property, that length is likely much shorter for the future.

teamdothis 09-12-2008 11:07 AM

So how long have most been waiting to get a call back after completing the online app?

JSDL 09-12-2008 11:09 AM

Thanks Bored

pagey 09-12-2008 11:34 AM


Originally Posted by teamdothis (Post 460535)
So how long have most been waiting to get a call back after completing the online app?


Mine has been in over a month....my times are low though so not expecting much with all the experience floating around out there right now.

bored 09-12-2008 11:37 AM

I've heard that HR got over 100 apps in the last week. All those apps have to go through the first screening process and then they go to the HR rep that sorts out all the interview scheduling. In other words, be patient. We're one of only a few airlines hiring right now, so you can imagine how swamped everyone is. BTW - a wide range of times are being interviewed, not only high time pilots.

Ron Mexico 09-12-2008 12:44 PM

I heard that NWA is going to give Mesaba all Pinnacles CRJ-200's in MSP. Could this be why they are hiring a lot right now?

dashdriver22 09-12-2008 01:18 PM


Originally Posted by Ron Mexico (Post 460585)
I heard that NWA is going to give Mesaba all Pinnacles CRJ-200's in MSP. Could this be why they are hiring a lot right now?


No, I believe Pinnacle has an agreement for something like 124 airplanes.

bored 09-12-2008 02:02 PM

Yes, but they can take more -200s if they get 900s in return. Something to think about... especially if PCL is in the running for the Freedom 900s, which I'm sure they are.

Xfire 09-12-2008 02:40 PM

Appearantly, they make up their minds very quickly to reduce the resumes they have to review.
Got a thanks but no thanks email already and haven't even interviewed.

More than double the posted mins AND RJ time. :-/

teamdothis 09-12-2008 03:18 PM


Originally Posted by Xfire (Post 460642)
Appearantly, they make up their minds very quickly to reduce the resumes they have to review.
Got a thanks but no thanks email already and haven't even interviewed.

More than double the posted mins AND RJ time. :-/

damn that sucks, ive got more than the mins and rj time as well. Did u get that reply right after your app went in or did it take a few days?:confused:


All times are GMT -8. The time now is 10:35 PM.


Website Copyright © 2026 MH Sub I, LLC dba Internet Brands