Airline Pilot Central Forums

Airline Pilot Central Forums (https://www.airlinepilotforums.com/)
-   Republic Airways (https://www.airlinepilotforums.com/republic-airways/)
-   -   New Hire training footprint (https://www.airlinepilotforums.com/republic-airways/137425-new-hire-training-footprint.html)

wcursino 04-19-2022 09:34 AM

New Hire training footprint
 
Does anyone here has an idea on how many weeks we stay in IND? Validations, etc.?

Thanks

ZapBrannigan 04-19-2022 09:42 AM

Back in the old days it was just a day or two in Indy for indoc, then to FSI STL for Jetstream initial, then they give you a couple of days to drive to PIT for bounces before reporting to JST or AOO to start your first weekend shift.

#Chautauqua4Ever!https://uploads.tapatalk-cdn.com/202...d791f2736d.jpg
(Sorry for the interruption, back to what you were talking about) :)

kettlechips 04-19-2022 10:24 AM

In total, about 5 weeks in indy, split up into 4 different stays (indoc, shift, efpt, GB LOFT)

Sent from my SM-G998U using Tapatalk

Captainfit 04-20-2022 03:35 PM

I have a date with RPA, does anyone know if there are any training delays, and if they are still doing their stipend for FO's?

Bensmithaviatio 04-20-2022 03:46 PM

There was just a teams chat on this. They said that there weren’t any training delays. They also said that total compensation for the first month is $1800. After that is your normal guarantee.

kettlechips 04-20-2022 04:12 PM


Originally Posted by Bensmithaviatio (Post 3409461)
There was just a teams chat on this. They said that there weren’t any training delays. They also said that total compensation for the first month is $1800. After that is your normal guarantee.

None if you don't count 4-5 week ioe delay

Sent from my SM-G998U using Tapatalk

SoFloFlyer 04-20-2022 05:41 PM

My LOE to IOE was exactly a month to the day. Indoc to LOE was 69 days. Can be longer if either you or your sim partner fails or needs extra training.

After the 30 day stipend, you get min guarantee plus per diem of 24/7. The per diem really shines through when you come in for EFPTs cuz that starts your month long stretch away from the house. Hope this helps!

akflier 04-20-2022 09:09 PM

New Hire training footprint
 
Hi all - interested in living in/flying out of CLT. Can anyone say how long to get that base for new hire FO's? Also - wondering what the wait time is currently averaging from CJO to training start date?

SoFloFlyer 04-20-2022 11:14 PM


Originally Posted by akflier (Post 3409646)
Hi all - interested in living in/flying out of CLT. Can anyone say how long to get that base for new hire FO's? Also - wondering what the wait time is currently averaging from CJO to training start date?

Unfortunately, CLT is only a maintenance base for us, not a crew base.

I heard that we are filling classes in August? I could be totally wrong though so don’t quote me.

CFIsoonToBeFO 04-21-2022 07:45 PM


Originally Posted by akflier (Post 3409646)
Hi all - interested in living in/flying out of CLT. Can anyone say how long to get that base for new hire FO's? Also - wondering what the wait time is currently averaging from CJO to training start date?

Apply to PSA if you want to be based in Charlotte

Average 04-22-2022 06:57 AM


Originally Posted by SoFloFlyer (Post 3409666)
Unfortunately, CLT is only a maintenance base for us, not a crew base.

How does one know which are crew bases and which are maintenance? I don’t see how to differentiate on the “bases” map.

CFIsoonToBeFO 04-22-2022 07:14 AM


Originally Posted by Average (Post 3410351)
How does one know which are crew bases and which are maintenance? I don’t see how to differentiate on the “bases” map.

The color of the dots by the city code

Captainfit2 04-22-2022 11:09 AM


Originally Posted by Bensmithaviatio (Post 3409461)
There was just a teams chat on this. They said that there weren’t any training delays. They also said that total compensation for the first month is $1800. After that is your normal guarantee.

Is there still the 17,500 sign on stipend.

SoFloFlyer 04-22-2022 11:17 AM


Originally Posted by Captainfit2 (Post 3410500)
Is there still the 17,500 sign on stipend.

$17,000 over 5 years? More like a retention bonus. You get $1000 on your first pay check

flybub 04-22-2022 12:06 PM


Originally Posted by SoFloFlyer (Post 3410507)
$17,000 over 5 years? More like a retention bonus. You get $1000 on your first pay check

In this market I wouldn't sign it. The bonus is so back end heavy, for some it creates a problem when they leave at year 4 and have to pay it back, or so they say. 17,500 over 5 years really isn't all that much when you average it out, especially when they tax you on it. Just my opinion though.

SoFloFlyer 04-22-2022 12:15 PM


Originally Posted by flybub (Post 3410545)
In this market I wouldn't sign it. The bonus is so back end heavy, for some it creates a problem when they leave at year 4 and have to pay it back, or so they say. 17,500 over 5 years really isn't all that much when you average it out, especially when they tax you on it. Just my opinion though.

I had the same concern. I you only get it if you do a certain amount of time. Not you get you the money and have to stay for a certain amount of time.

akflier 04-22-2022 02:17 PM


Originally Posted by SoFloFlyer (Post 3409666)
Unfortunately, CLT is only a maintenance base for us, not a crew base.

I heard that we are filling classes in August? I could be totally wrong though so don’t quote me.

Appreciate the info

Captainfit2 04-24-2022 06:32 AM

Do you have to sign something for their retention bonus?

SoFloFlyer 04-24-2022 07:32 AM


Originally Posted by Captainfit2 (Post 3411393)
Do you have to sign something for their retention bonus?

Yes, they send a promissory note with the CJO.

Captainfit 04-25-2022 01:37 PM


Originally Posted by SoFloFlyer (Post 3411430)
Yes, they send a promissory note with the CJO.

Okay, I didn't see that in my CJO. I enrolled in the cadet program a bit ago.

SoFloFlyer 04-25-2022 08:37 PM


Originally Posted by Captainfit (Post 3412111)
Okay, I didn't see that in my CJO. I enrolled in the cadet program a bit ago.

It comes through when you have to sign the CJO when you transition from Cadet to FO. That’s what happened to me.

Captainfit2 04-27-2022 07:25 AM


Originally Posted by SoFloFlyer (Post 3412320)
It comes through when you have to sign the CJO when you transition from Cadet to FO. That’s what happened to me.

Okay, do you have to repay it all back if you leave in 6-24 months?

SoFloFlyer 04-27-2022 08:06 AM


Originally Posted by Captainfit2 (Post 3413047)
Okay, do you have to repay it all back if you leave in 6-24 months?

You do. How much is broken down in the contract. It’s not the whole thing

CmdrShepardN7 05-08-2022 03:58 PM

Is anyone in Dallas today for ATP-CTP this week? I am on my way, but have not received any information from Flight Safety as far as itinerary or schedule. I assume it's at 8 am, but I can't get a confirmation.

Tailwindsareamyth 05-08-2022 09:47 PM


Originally Posted by CmdrShepardN7 (Post 3419264)
Is anyone in Dallas today for ATP-CTP this week? I am on my way, but have not received any information from Flight Safety as far as itinerary or schedule. I assume it's at 8 am, but I can't get a confirmation.

You should have gotten an email from flight safety, you can use it to set up a flight Safety account and see your schedule. It should be Mon-Thur ground school followed by two sims. Class starts at 8:30 I believe. Have fun with Mark, great guy.

CmdrShepardN7 05-10-2022 08:48 AM


Originally Posted by Gammon89 (Post 3419351)
You should have gotten an email from flight safety, you can use it to set up a flight Safety account and see your schedule. It should be Mon-Thur ground school followed by two sims. Class starts at 8:30 I believe. Have fun with Mark, great guy.

There was an outgoing email problem, and no one from Republic got the itineraries or schedules until we arrived to class.

CmdrShepardN7 05-10-2022 08:49 AM


Originally Posted by Gammon89 (Post 3419351)
You should have gotten an email from flight safety, you can use it to set up a flight Safety account and see your schedule. It should be Mon-Thur ground school followed by two sims. Class starts at 8:30 I believe. Have fun with Mark, great guy.

And I think Mark is retiring, our guy is Art, with Mark observing.

Bensmithaviatio 05-11-2022 03:02 PM

Is there still an email issue? I have CTP on Monday and still haven’t heard anything except my flights to Dallas.

CmdrShepardN7 05-12-2022 03:49 PM


Originally Posted by Bensmithaviatio (Post 3420752)
Is there still an email issue? I have CTP on Monday and still haven’t heard anything except my flights to Dallas.

I think they got it under control, but I would call FSI on Friday if you haven’t heard yet.

Bensmithaviatio 05-12-2022 04:01 PM

Roger that, thanks for the help! It is the Dallas North, correct?

CmdrShepardN7 05-14-2022 01:18 PM


Originally Posted by Bensmithaviatio (Post 3421472)
Roger that, thanks for the help! It is the Dallas North, correct?

Some guys were actually sent to ATP, so I'm not completely sure. Our class was in 3201 E Airfield Dr, Dallas, TX 75261. I would guess that's where you'd be heading as well.

Tailwindsareamyth 05-16-2022 09:54 AM


Originally Posted by CmdrShepardN7 (Post 3422634)
Some guys were actually sent to ATP, so I'm not completely sure. Our class was in 3201 E Airfield Dr, Dallas, TX 75261. I would guess that's where you'd be heading as well.


Our class was about 50/50 Atp vs flight Safety also flight Safety north/south are in the same building just different doors.


Sent from my iPhone using Tapatalk

PUNK 05-22-2022 11:57 PM

Is 90 days from indoc to IOE completion accurate?

How's the training quality at republic?

How does the erj fly compared with the crj?

LoneStar32 05-23-2022 04:33 AM


Originally Posted by PUNK (Post 3428082)
Is 90 days from indoc to IOE completion accurate?

How's the training quality at republic?

How does the erj fly compared with the crj?

Have no idea about timelines but training at Republic is top notch. Night and day difference flying the 175 vs. the CRJ fleet, doesn't even compare. If you ever move on there are a lot of aspects about the 175 that you'll miss.

SoFloFlyer 05-23-2022 05:48 AM


Originally Posted by PUNK (Post 3428082)
Is 90 days from indoc to IOE completion accurate?

How's the training quality at republic?

How does the erj fly compared with the crj?

Friend just finished training and 90ish days is accurate. Republic has an amazing training department. Everyone is knowledgeable! ERJ really does make you lazy. Can’t speak for the CRJ, but it’s quite the difference from what I hear.

FlyinCat 05-23-2022 05:53 AM


Originally Posted by PUNK (Post 3428082)
Is 90 days from indoc to IOE completion accurate?

How's the training quality at republic?

How does the erj fly compared with the crj?

I finished LOE just under 90 days but still waiting on IOE. I anticipate will be done at about 120 days, based on a 4 week wait estimate for IOE. Still faster than most. Training at Republic is better than most regionals, but still suffering from instructor and LCA shortages like everyone else.

Andy Dufresne 05-23-2022 07:56 AM


Originally Posted by PUNK (Post 3428082)
Is 90 days from indoc to IOE completion accurate?

How's the training quality at republic?

How does the erj fly compared with the crj?

Hearing my friends who fly at SkyWest talk about their CRJ training makes me feel very lucky to have an all ERJ fleet. I think I’d rather fly a Cirrus than a CRJ200.

As others have stated, Republic’s training department is top notch.

flightvector 06-27-2022 08:46 PM

Is the wait for IOE still quite long at Republic?

Andy Dufresne 06-27-2022 08:56 PM


Originally Posted by flightvector (Post 3449894)
Is the wait for IOE still quite long at Republic?

Define quite long. SkyWest is currently sitting at 3-4 months, for reference.

CFIsoonToBeFO 06-27-2022 10:00 PM


Originally Posted by Andy Dufresne (Post 3449901)
Define quite long. SkyWest is currently sitting at 3-4 months, for reference.

About 5 weeks for the last 2 classes at RPA. Enjoy the free vacation


All times are GMT -8. The time now is 03:20 AM.


User Alert System provided by Advanced User Tagging v3.3.0 (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
Website Copyright ©2000 - 2017 MH Sub I, LLC dba Internet Brands