Ipa update
#1
UPS Officially Informs IPA of Network Changes
This morning, UPS informed the IPA of network changes that will occur due to significantly lower volume levels in the system.
Beginning in Bid Period 5 (July), UPS intends to cease the DFW NDA sort, the PHL 2nd Day Air sort, as well as some reductions to contractual postal flying.
The IPA pressed the Company on any discussion of potential crew staffing reductions as a result of these changes. UPS maintains that there is currently no plan to reduce staffing beyond what will be absorbed through anticipated attrition.
The IPA will communicate further information as it is available.
This morning, UPS informed the IPA of network changes that will occur due to significantly lower volume levels in the system.
Beginning in Bid Period 5 (July), UPS intends to cease the DFW NDA sort, the PHL 2nd Day Air sort, as well as some reductions to contractual postal flying.
The IPA pressed the Company on any discussion of potential crew staffing reductions as a result of these changes. UPS maintains that there is currently no plan to reduce staffing beyond what will be absorbed through anticipated attrition.
The IPA will communicate further information as it is available.
Thread
Thread Starter
Forum
Replies
Last Post



