![]() |
Originally Posted by viper548
(Post 2763328)
Reserves 12-13 depending on if it's a 30 or 31 day contractual month. For line holders it's pretty much a minimum of 13. 17 Days on at min guarantee is 89.25. The line construction window could possibly get that high, allowing 17 days on. In a 30 day month, that would be 13 off. I'd say 98% of the time 14 off is the minimum for line holders.
|
Originally Posted by EMBFlyer
(Post 2763671)
For line holders, it's 10 guaranteed days off, regardless of month length.
|
do you still get 13 off w vaca? Have R9 and vaca march. built 1 4 day block. Only leaves 8 days on call. hoping for a no call month as i’ll have a lot of existing credit and be very sr on SC.
|
Originally Posted by Battlinbear21
(Post 2763867)
do you still get 13 off w vaca? Have R9 and vaca march. built 1 4 day block. Only leaves 8 days on call. hoping for a no call month as i’ll have a lot of existing credit and be very sr on SC.
|
Originally Posted by Battlinbear21
(Post 2763867)
do you still get 13 off w vaca? Have R9 and vaca march. built 1 4 day block. Only leaves 8 days on call. hoping for a no call month as i’ll have a lot of existing credit and be very sr on SC.
Just to clarify, the 4 day block is your R9 correct? I have no doubt if I am wrong someone will help correct us both. |
Originally Posted by PRS Guitars
(Post 2763877)
No you don’t. You need to consult the proration table at the back of the PBS guide. CQT complicates it further. Always call the help desk when in doubt.
EDIT: just looked...had 12 total days with R9 and Vacation |
Originally Posted by OVBIII
(Post 2763881)
I am looking at section 15.D.4.k (reserve proration table). With 7 days vacation and I believe you said 4 days for R9 so 11 days unavailable. 30 days (march bid month) - 11 = 19 days available which gives you 12 reserve days and 7 days off .
Just to clarify, the 4 day block is your R9 correct? I have no doubt if I am wrong someone will help correct us both. |
Originally Posted by Battlinbear21
(Post 2763884)
r9 is a 4 day event yes. and I did a 4 day rsv block to be a valid stretch. I figured the 8 days was too good to be true. didn’t plan on them both being in the same month. but they bought training from me in february. maybe they will do it again and i’ll dequal:)
|
Originally Posted by OVBIII
(Post 2763887)
Let me know if you hit the lotto!!!! I have heard its been happening lately!
|
Originally Posted by Buzzlightyear
(Post 2763748)
I’ve been there. Training months a junior line holder typically sees 10 days off which massively blows.
|
| All times are GMT -8. The time now is 10:06 AM. |
Website Copyright © 2026 MH Sub I, LLC dba Internet Brands