Originally Posted by Kougarok
(Post 2529303)
Parked next to NAC’s shiny new 767-300 this morning. They’re doing proving runs with revenue freight between MIA and SJU now.
If I was a younger guy I would seriously consider working for them! Pays decent with the $10,000 retention money. Probably make Captain fairly quickly. I am guessing junior guys would be based in MIA. I suspect we might loose a few 151ers to them. |
Originally Posted by Jason605
(Post 2529465)
If things tank here at ABX and Northern puts us MIA guys in the left seat, (assuming the NAC guys don't want to commute or move to Miami) I would seriously consider it. Especially if it's out and backs and the money is right. On a side note, they have to seriously get their ground staff under control. They have absolutely no concept of "on time".
|
Does anyone know how close they are to getting 76 rates? I mean the plane is flying now, right? What are they paying for it. Looked at the rates here and those 73 rates are sad.
Are the NAC pilots gonna join the ranks of "corrosion corner" in MIA? |
Originally Posted by Jason605
(Post 2530645)
Does anyone know how close they are to getting 76 rates? I mean the plane is flying now, right? What are they paying for it. Looked at the rates here and those 73 rates are sad.
Are the NAC pilots gonna join the ranks of "corrosion corner" in MIA? |
Originally Posted by Jason605
(Post 2529465)
On a side note, they have to seriously get their ground staff under control. They have absolutely no concept of "on time".
|
On the aloha air cargo website it say NAC is hiring on to the 767 for ANC/HNL/MIA. Was looking to get HNL hopefully any scoops on how basing works at NAC ? Also I'm at 1800 hrs and 350 multi jet will I be at all competitive ? Mins said atp only.
|
Originally Posted by hackerbyday
(Post 2531820)
Correct me if I'm wrong, but isn't ATI operating the aircraft for Northern similar to the Aloha run for now? The ramp crew is probably the same SAS people that have handled ABX for years since Northern owns them now. And I'm going to guess that AMES is providing contract mx for them and the loadmaster used to fly for ABX and was let go recently. Its an awful small world on the Eastern U.
|
Originally Posted by TimetoClimb
(Post 2531846)
On the aloha air cargo website it say NAC is hiring on to the 767 for ANC/HNL/MIA. Was looking to get HNL hopefully any scoops on how basing works at NAC ? Also I'm at 1800 hrs and 350 multi jet will I be at all competitive ? Mins said atp only.
|
Originally Posted by hackerbyday
(Post 2531820)
Correct me if I'm wrong, but isn't ATI operating the aircraft for Northern similar to the Aloha run for now? The ramp crew is probably the same SAS people that have handled ABX for years since Northern owns them now. And I'm going to guess that AMES is providing contract mx for them and the loadmaster used to fly for ABX and was let go recently. Its an awful small world on the Eastern U.
|
And I hear proving runs are done.
|
All times are GMT -8. The time now is 11:58 PM. |
User Alert System provided by
Advanced User Tagging v3.3.0 (Lite) -
vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
Website Copyright ©2000 - 2017 MH Sub I, LLC dba Internet Brands