![]() |
Originally Posted by sailingfun
(Post 2850530)
First of all your max duty day is defined by the contract. You work under the FAR’s where the extension is legal. It was not that long ago that the FAR’s had no max duty day. Legal to start, legal to finish. If you will exceed your max duty day you don’t have to fill out anything or satisfy anything. You are done and will get paid 100% of the time.
If you want off your trip before your contractual max duty day you will be asked to fill one form out that takes two or three minutes. Oh the horror! I have never had a job where if I asked off work early the boss did not ask why. |
Originally Posted by waldo135
(Post 2850554)
How many jobs have you had that if you were scheduled to work an 8 hour day and the company came and said “Hey, you have to work 2 more hours” you were potentially punished for saying no.
What I’ve never had till now is a job where I could leave early and still get paid for work I didn’t do. All I have to do is fill out a form and talk to the duty pilot. I’ve done it more than once, it’s a total non event. |
Originally Posted by sailingfun
(Post 2850530)
First of all your max duty day is defined by the contract. You work under the FAR’s where the extension is legal...
...If you will exceed your max duty day you don’t have to fill out anything or satisfy anything. You are done and will get paid 100% of the time... ...If you want off your trip before your contractual max duty... Setting aside the FRMS 2 hour exception (12.D.1, exception 2), PWA limits are solely for rotation construction (provides a 30 minute buffer to the FAR FDP limit). Once you are out flying on your trip, the PWA limits are cast aside and FAR Duty Period (and, obviously, flight time) limits apply - Table B (unaugmemted) or Table C (augmented). You could exceed the max contractual PWA FDP shown on your rotation (i.e., "4:06/8:30/11:00" where "4:06" is the scheduled FDP, "8:30" represents the PWA FDP maximum for rotation construction and "11:00" is the max FAR FDP with a two hour extension) but not exceed your FAR FDP (next line - "9:00/11:00/8:00" where "9:00" is the FAR FDP limit, "11:00" is the FAR FDP extension limit and "8:00" is the FAR flight time limit), much less the FAR FDP limit with a 2 hour extension. If you walked away 1 minute after exceeding the PWA FDP, you would still have to fill out an FFDR. Basically, if you quit before you hit a FAR limit, the company wants an FFDR. If you decline to extend, the company wants an FFDR. Hopefully the FAA POI and/or negotiators will get this changed in the near future in order to make extending the exception rather than the goal, but, for now, those are the rules we have "agreed" to live under based upon prior PWA ratifications. |
Originally Posted by sailingfun
(Post 2850530)
I have never had a job where if I asked off work early the boss did not ask why.
|
Originally Posted by Rooster435
(Post 2850570)
What I’ve never had till now is a job where I could leave early and still get paid for work I didn’t do. All I have to do is fill out a form and talk to the duty pilot. I’ve done it more than once, it’s a total non event.
|
Originally Posted by GogglesPisano
(Post 2850610)
This is not about asking the boss to take off early. It's the boss asking you to work late, and when you refuse you're asked to write a report.
People making the amount of money we do will find themselves being asked to do a lot of things and often they don't get a choice in the matter. |
Originally Posted by ChecklistMonkey
(Post 2850614)
Someone never actually worked in the real world. In the real world, if your boss tells you to work overtime or come in on your day off, unless you have a day off or can convince him you have something you just can't miss, you do it. If you don't, you will find yourself without a job.
People making the amount of money we do will find themselves being asked to do a lot of things and often they don't get a choice in the matter. How very presumptuous of you. I've worked plenty of non-aviation jobs. We don't have normal jobs. We operate in an inherently risky environment where skills and judgement must be "A-game" quality. Refusing to work much longer than planned should be a "no questions asked" operation. |
Originally Posted by waldo135
(Post 2850554)
How many jobs have you had that if you were scheduled to work an 8 hour day and the company came and said “Hey, you have to work 2 more hours” you were potentially punished for saying no.
|
Originally Posted by GogglesPisano
(Post 2850623)
How very presumptuous of you. I've worked plenty of non-aviation jobs.
We don't have normal jobs. We operate in an inherently risky environment where skills and judgement must be "A-game" quality. Refusing to work much longer than planned should be a "no questions asked" operation. |
Originally Posted by ChecklistMonkey
(Post 2850637)
Your argument was that we are basically the only job in the US where we can be made to stay late.
|
| All times are GMT -8. The time now is 09:50 PM. |
Website Copyright © 2026 MH Sub I, LLC dba Internet Brands