Airline Pilot Central Forums

Airline Pilot Central Forums (https://www.airlinepilotforums.com/)
-   ExpressJet (https://www.airlinepilotforums.com/expressjet/)
-   -   ExpressJet (https://www.airlinepilotforums.com/expressjet/93531-expressjet.html)

Bamauofa 02-22-2016 04:59 PM

ExpressJet
 
What is the interview process like? Sim? Also what base and aircraft type would one expect out of training. How long until a new hire could get an Atlanta base?

ThreeStripe 02-22-2016 06:45 PM


Originally Posted by Bamauofa (Post 2073544)
What is the interview process like? Sim? Also what base and aircraft type would one expect out of training. How long until a new hire could get an Atlanta base?

Aviationinterviews.com for latest gouge
No
ATL or DTW
Immediately

Make sure you ask for the CRJ side if you want Atlanta.

WakeWash 02-22-2016 07:36 PM


Originally Posted by ThreeStripe (Post 2073626)
Aviationinterviews.com for latest gouge
No
ATL or DTW
Immediately

Make sure you ask for the CRJ side if you want Atlanta.

Correct me if I'm wrong, but isn't RSV in ATL like forever? I have a buddy who is here at PSA cause they told him 3.5 years reserve in ATL. Granted that was 2 years ago.

Nevets 02-22-2016 08:26 PM

Atl & dtw = crj
ewr, iah, cle, ord = erj
dfw = crj & erj

Av8rking 02-23-2016 03:42 AM


Originally Posted by WakeWash (Post 2073670)
Correct me if I'm wrong, but isn't RSV in ATL like forever? I have a buddy who is here at PSA cause they told him 3.5 years reserve in ATL. Granted that was 2 years ago.

Nah. For March the most junior line on the 200 without vacation or training was a January 2015 hire. So less than a year online.

tommytomcat 02-23-2016 04:28 AM

What are the call out times?

ThreeStripe 02-23-2016 05:30 AM


Originally Posted by tommytomcat (Post 2073761)
What are the call out times?

2 hours...........

Wynncore 02-23-2016 10:16 AM


Originally Posted by Av8rking (Post 2073752)
Nah. For March the most junior line on the 200 without vacation or training was a January 2015 hire. So less than a year online.

To add to this: ATL is the most "senior" base too. If you want QoL and an expressway to a line, bid the CRJ ATL and avoid the 700/900 like the plague.

BeechedJet 02-23-2016 11:55 AM

Reserve on the 700/900 in ATL and DTW is well above 2 years. It's half that on the 200.

Mr Rumbold 02-23-2016 01:04 PM

What is ERJ-145 junior base?
How long is reserve on that airframe?

How long to get either EWR or IAD?


All times are GMT -8. The time now is 02:56 AM.


User Alert System provided by Advanced User Tagging v3.3.0 (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
Website Copyright ©2000 - 2017 MH Sub I, LLC dba Internet Brands