Airline Pilot Central Forums

Airline Pilot Central Forums (https://www.airlinepilotforums.com/)
-   Regional (https://www.airlinepilotforums.com/regional/)
-   -   PinnaColaba Bankruptcy soon (https://www.airlinepilotforums.com/regional/63929-pinnacolaba-bankruptcy-soon.html)

TSioux55 12-11-2011 12:50 PM


Originally Posted by block30 (Post 1099873)
What company does Timmeh fly for? Please tell me its not PinnaColAba.

Don't worry, Timmeh isn't part of PinnaColAba.

TSioux55 12-11-2011 12:51 PM


Originally Posted by Silver02ex (Post 1099968)
Please tell me David White is the first to go.


Oh gawd we can only hope!!:mad:

mloub 12-11-2011 01:09 PM

I'm not a Pilot, but I have an interest in Pinnacle.

I've seen several people mention that reducing the certificates to one from the current 3 - or two that management has proposed - will save on training costs. I am having trouble understanding why that is though. Wouldn't training costs be a factor of folks moving from one aircraft type to another, regardless of what certificate those aircraft are on?

Or are SOP slightly different from certificate to certificate requiring training above and beyond what you would expect just for the aircraft switch?

I realize this is an amateurish question, but hey, when it comes to the industry I'm an amateur.

M.

etflies 12-11-2011 01:35 PM

I could be wrong but moving certificates means the pilot has to go through Indoc training, meaning manuals, and an added week or two of hotel, classroom and instructor time. I'm sure that adds up. Maybe someone can provide more insight though.

DirectTo 12-11-2011 01:56 PM


Originally Posted by TSioux55 (Post 1100221)
Don't worry, Timmeh isn't part of PinnaColAba.

Unless you believe the rumorz. Then he will be. When you guys buy CommutAir.

FlyingKat 12-11-2011 02:24 PM


Originally Posted by mloub (Post 1100227)
I'm not a Pilot, but I have an interest in Pinnacle.

I've seen several people mention that reducing the certificates to one from the current 3 - or two that management has proposed - will save on training costs. I am having trouble understanding why that is though. Wouldn't training costs be a factor of folks moving from one aircraft type to another, regardless of what certificate those aircraft are on?

Or are SOP slightly different from certificate to certificate requiring training above and beyond what you would expect just for the aircraft switch?

I realize this is an amateurish question, but hey, when it comes to the industry I'm an amateur.

M.

As far as the FAA is concerned, you might as well be moving from Delta to United when you are switching certificates. They see a different certificate as a completely seperate airline, even though it is owned by the same company. Each individual airline has to have certain positions mandated by the FAA and they cannot be cross utilized, even if both certificates are owned by the same company. For pilots and flight attendants, that means they have to go through the entire new hire process just like they never worked for the company when switching certificates. This means a 12 week training evolution as compared to a 4 or 6 week evolution for normal transition training on the same certificate.

block30 12-11-2011 02:27 PM


Originally Posted by DirectTo (Post 1100247)
Unless you believe the rumorz. Then he will be. When you guys buy CommutAir.

Thanks for your input, and TSioux.

FlyingKat 12-11-2011 02:30 PM


Originally Posted by Fly782 (Post 1099933)
You mean after 11-09 is complete?

I can see this playing out one of two ways.

The first way is Menke and co find a way to put all these aircraft on one certificate. They ask ALPA to slow down or halt the implementation of 11-09 and freeze everybody where they are until the integration of the certificates is complete. The only movement will be that caused by attrition and openings at each certificate.

The second way is Menke cannot find a way to get everything down to one certificate. Then I think they will ask ALPA to put a quota on how many can move and slow the process down to make it more bearable in terms of cost. Then once the award is implemented there will be restrictions in place to prevent movement between certificates.

mikeypat15 12-11-2011 04:23 PM


Originally Posted by FlyingKat (Post 1100257)
I can see this playing out one of two ways.

The first way is Menke and co find a way to put all these aircraft on one certificate. They ask ALPA to slow down or halt the implementation of 11-09 and freeze everybody where they are until the integration of the certificates is complete. The only movement will be that caused by attrition and openings at each certificate.

The second way is Menke cannot find a way to get everything down to one certificate. Then I think they will ask ALPA to put a quota on how many can move and slow the process down to make it more bearable in terms of cost. Then once the award is implemented there will be restrictions in place to prevent movement between certificates.

What happens to XJ Saab pilots who no longer have an aircraft to fly?

mooney 12-11-2011 04:53 PM


Originally Posted by mloub (Post 1100227)
I'm not a Pilot, but I have an interest in Pinnacle.

I've seen several people mention that reducing the certificates to one from the current 3 - or two that management has proposed - will save on training costs. I am having trouble understanding why that is though. Wouldn't training costs be a factor of folks moving from one aircraft type to another, regardless of what certificate those aircraft are on?

Or are SOP slightly different from certificate to certificate requiring training above and beyond what you would expect just for the aircraft switch?

I realize this is an amateurish question, but hey, when it comes to the industry I'm an amateur.

M.

Say I am a Pinnacle MEM based -200 CA. I want MEM -900 CA. If we were one certificate, all I would have to do is 3 days or so of differences training and a little IOE. Since only Mesaba has a MEM-900 base, and they are on a separate certificate, I would have to go through full newhire indoc and aircraft training and full sim sessions and IOE. 8 weeks or so. Then when Pinnacle and Mesaba finally get their certificates merged in a few months, since it would be the Pinnacle certificate, I would have to go through an abbreviated Pinnacle indoc/systems/sim/IOE again. So basically 2 additional full type rating courses in an airplane I already have a type in vs a 1 week process...


Originally Posted by FlyingKat (Post 1100257)
I can see this playing out one of two ways.

The first way is Menke and co find a way to put all these aircraft on one certificate. They ask ALPA to slow down or halt the implementation of 11-09 and freeze everybody where they are until the integration of the certificates is complete. The only movement will be that caused by attrition and openings at each certificate.

The second way is Menke cannot find a way to get everything down to one certificate. Then I think they will ask ALPA to put a quota on how many can move and slow the process down to make it more bearable in terms of cost. Then once the award is implemented there will be restrictions in place to prevent movement between certificates.

Last I heard the certificate mergers were going to be approved by the Feds in late NOV/DEC, but the paperwork that Pinnacle sent to them was so full of typos and grammar errors etc. the feds threw it back at them and said fix it. Anyone who has ever received a 9e memo knows this is a very real possibility. Believe this rumor at your own risk. So it's basically a matter of getting a grammar nazi to merge our certificates.


All times are GMT -8. The time now is 09:57 AM.


Website Copyright © 2026 MH Sub I, LLC dba Internet Brands