SOC Date Revised
#11
Gets Weekends Off
Joined: Feb 2010
Posts: 303
Likes: 0
From: A320/A319/B737 Sys Acft Maint Controller
the FAA sorted through over 600 operating manuals and approves what THEY wanted Not just what the compant wanted. We now have 179 operating volumes and over 10K
pages of documents still for the FAA to review. Until the IT stuff is resolved with the Electronic log book we won't be finished. The flight proceedures are NOT the overriding factor. Dispatch will be integrating this winter Maint.Control not until next May if ever and then everything will be changed again when we all move to an even NEWER system.
There's no way in HELL anybody could have forseen what date the SOC was coming.
And even AFTER SOC none of this integreation will be even STARTED much less Finished
The FAA inspector we talked to said that even Delta and Northwest aren't even close to finished integrating yet. so this might take another 2-3 years to complete which includes the A350's and the UAL ordered 787's and possibly the 747-8's..
pages of documents still for the FAA to review. Until the IT stuff is resolved with the Electronic log book we won't be finished. The flight proceedures are NOT the overriding factor. Dispatch will be integrating this winter Maint.Control not until next May if ever and then everything will be changed again when we all move to an even NEWER system.
There's no way in HELL anybody could have forseen what date the SOC was coming.
And even AFTER SOC none of this integreation will be even STARTED much less Finished
The FAA inspector we talked to said that even Delta and Northwest aren't even close to finished integrating yet. so this might take another 2-3 years to complete which includes the A350's and the UAL ordered 787's and possibly the 747-8's..
#14
Banned
Joined: Jun 2008
Posts: 2,282
Likes: 0
From: A320 Cap
the FAA sorted through over 600 operating manuals and approves what THEY wanted Not just what the compant wanted. We now have 179 operating volumes and over 10K
pages of documents still for the FAA to review. Until the IT stuff is resolved with the Electronic log book we won't be finished. The flight proceedures are NOT the overriding factor. Dispatch will be integrating this winter Maint.Control not until next May if ever and then everything will be changed again when we all move to an even NEWER system.
There's no way in HELL anybody could have forseen what date the SOC was coming.
And even AFTER SOC none of this integreation will be even STARTED much less Finished
The FAA inspector we talked to said that even Delta and Northwest aren't even close to finished integrating yet. so this might take another 2-3 years to complete which includes the A350's and the UAL ordered 787's and possibly the 747-8's..
pages of documents still for the FAA to review. Until the IT stuff is resolved with the Electronic log book we won't be finished. The flight proceedures are NOT the overriding factor. Dispatch will be integrating this winter Maint.Control not until next May if ever and then everything will be changed again when we all move to an even NEWER system.
There's no way in HELL anybody could have forseen what date the SOC was coming.
And even AFTER SOC none of this integreation will be even STARTED much less Finished
The FAA inspector we talked to said that even Delta and Northwest aren't even close to finished integrating yet. so this might take another 2-3 years to complete which includes the A350's and the UAL ordered 787's and possibly the 747-8's..
#15
I know it's "apples and oranges".....but SWA looks like they will have SOC in the first quarter of 2012, with SLI. In my opinion...this attempt to cherry pick the cheapest procedure from each airline is just dragging the whole merger out. Wondering if it really saves anything in the long run. As it is now....I'm carrying more confusing paperwork now than I ever have.
FUPM
FUPM
#16
the FAA sorted through over 600 operating manuals and approves what THEY wanted Not just what the compant wanted. We now have 179 operating volumes and over 10K
pages of documents still for the FAA to review. Until the IT stuff is resolved with the Electronic log book we won't be finished. The flight proceedures are NOT the overriding factor. Dispatch will be integrating this winter Maint.Control not until next May if ever and then everything will be changed again when we all move to an even NEWER system.
There's no way in HELL anybody could have forseen what date the SOC was coming.
And even AFTER SOC none of this integreation will be even STARTED much less Finished
The FAA inspector we talked to said that even Delta and Northwest aren't even close to finished integrating yet. so this might take another 2-3 years to complete which includes the A350's and the UAL ordered 787's and possibly the 747-8's..
pages of documents still for the FAA to review. Until the IT stuff is resolved with the Electronic log book we won't be finished. The flight proceedures are NOT the overriding factor. Dispatch will be integrating this winter Maint.Control not until next May if ever and then everything will be changed again when we all move to an even NEWER system.
There's no way in HELL anybody could have forseen what date the SOC was coming.
And even AFTER SOC none of this integreation will be even STARTED much less Finished
The FAA inspector we talked to said that even Delta and Northwest aren't even close to finished integrating yet. so this might take another 2-3 years to complete which includes the A350's and the UAL ordered 787's and possibly the 747-8's..
#18
#19
Gets Weekends Off
Joined: Apr 2007
Posts: 880
Likes: 0
Yep, supposedly at the end of the month it will be complete and we will use the United call sign 1 December.
Another item is that the rumor is that QTR 1, the Airbus will be coming to IAH and a lot of the 737s go to ORD a little to DEN and a lot to LAX once the T&PA expire. Whether they displace all to create hate and discontent or just build trips as through flight will yet to be determined.
Interesting times.
Another item is that the rumor is that QTR 1, the Airbus will be coming to IAH and a lot of the 737s go to ORD a little to DEN and a lot to LAX once the T&PA expire. Whether they displace all to create hate and discontent or just build trips as through flight will yet to be determined.
Interesting times.
Thread
Thread Starter
Forum
Replies
Last Post




